top of page
Renovations - S. Boston, MA
PUC was contracted to make major structural repairs to severely decayed beams and framing at rear side of building(s). Also to remove all existing wood trim on the entire building, and replace with Azek PVC trim. Replace all vinyl slate roof tiles, and replace all decks and epdm roofing.

IMG_0938

IMG_1053

E3 tower rear

IMG_0938
1/5
bottom of page